Activity Based Costing Example

Activity based costing (ABC) allocates manufacturing overhead costs to manufactured in a more logical way than the traditional method of simply assigning costs on the basis of machine hours. Activity based costing first allocates costs to the activities that are the real reason of the overhead. It then allocates the cost of those activities only to the products that are actually demanding the activities.